# Backlog & sprints that keep their promises

Source: https://iskue.com/features/backlog-sprints/

> Stable ordering, one active sprint at a time, and nothing falls through when it closes.

Your backlog is a single ordered list, ranked with LexoRank-style strings so moving a ticket writes exactly one row — no mass renumbering. Sprints follow a strict lifecycle: planned, active, completed, with one active sprint per project at a time. When you complete a sprint, anything not done goes straight back to the backlog, so nothing silently disappears.

## What you get

- **Single-row reordering**: Each ticket carries a lexicographic rank string over the alphabet a–z; moving it between two neighbours computes a midpoint string and updates one row.
- **Nightly rebalancing**: A scheduled job runs at 03:00 and, when any rank in a project grows past 20 characters, rewrites that project's ranks as short, evenly spaced strings with room for future inserts.
- **Single-active sprint guard**: Starting a sprint is rejected with a conflict if another sprint is already active in the project, so your board always reflects one current sprint.
- **Unfinished work returns**: Completing a sprint moves every ticket whose status category is not Done back to the backlog and stamps the sprint's end date.
- **Sprint goals and workload**: Each sprint carries an editable goal, and a workload panel totals tickets and story points per assignee, with the unassigned bucket always listed last.
- **Team capacity planning**: Set a planned point capacity per team for a sprint and compare it against actual load; over-capacity teams are flagged with a red load bar.

## Ordering that stays fast

Ranks are plain strings compared lexicographically, so the database sorts the backlog with an ordinary index on (project, rank). Repeated midpoint insertion slowly lengthens rank strings; the nightly job detects any rank over 20 characters and rewrites the whole project's ranks as fixed-width strings with gaps of at least 26 between neighbours. Bulk imports get constant-width 7-character ranks up front, so imported backlogs never trigger runaway growth.

## A deliberate sprint lifecycle

A sprint is planned, active, or completed — nothing else. Only a planned sprint can start, and starting sets the start date to today with an optional end date. Only an active sprint can be completed, and a completed sprint refuses new tickets. Sprint management — create, start, complete, and assigning tickets to a sprint — sits behind a dedicated permission, separate from ordinary project membership.

## Planning signals where you plan

The backlog page shows each open sprint with its running point total, goal, and end date. Open the workload panel for a per-assignee breakdown of tickets and points, and a per-team view of load against planned capacity. You can group the backlog by status, assignee, priority, or type; rank controls step aside while a grouping is active, because rank order only means something in rank order.

## Key facts

- 3 sprint states: planned, active, completed
- One active sprint per project
- Nightly rank rebalance at 03:00
- Reordering a ticket updates one row

## In practice

```
POST /api/v1/projects/CORE/sprints/{sprintId}/start
{ "endDate": "2026-08-14" }

POST /api/v1/tickets/CORE-42/rank
{ "previousTicketKey": "CORE-7", "nextTicketKey": "CORE-19" }
```